Solar Field Access Roads – Harrells, NC

With over 640 acres of land planned for solar fields, the client needed access roads throughout to service and monitor the solar panels. The property was in a low-lying area and extremely wet, and called for a limestone treatment with our FDR process to dry and stabilize the soil and deliver strong, long-lasting roads.