Private School
Raleigh, NC
Edge Mill, Chipseal & Overlay
The existing school parking lot at this school had been sealcoated multiple times and was still in good enough condition to overlay the existing asphalt. The chipseal process was utilized to prevent reflective cracking on the new asphalt surface. This project was completed over a one-week period during the summer while students were on break.