City of Raleigh Reclamation Project
Raleigh, NC
Full Depth Reclamation
A water main break on Glenwood Avenue just one week before Thanksgiving 2020 created a potential nightmare for the City of Raleigh, Crabtree Valley Mall and Thanksgiving travelers. Our emergency response team was able to mobilize equipment within hours to begin a non-stop soil stabilization project to open the road before the Thanksgiving holiday. This project required existing concrete excavation, soil stabilization as well as paving.